1
00:00:00,150 --> 00:00:00,990
In this lesson,

2
00:00:00,990 --> 00:00:04,080
we're going to talk about continuity of operations plans.

3
00:00:04,080 --> 00:00:06,810
Now, your organization's continuity of operations plan

4
00:00:06,810 --> 00:00:08,370
is going to ensure that your organization

5
00:00:08,370 --> 00:00:11,490
is able to recover from a disruptive event or disaster.

6
00:00:11,490 --> 00:00:13,920
This is a specialized field within an organization,

7
00:00:13,920 --> 00:00:15,960
and one that takes a lot of planning and forethought

8
00:00:15,960 --> 00:00:17,730
to keep your organization running smoothly

9
00:00:17,730 --> 00:00:19,560
during an event or incident.

10
00:00:19,560 --> 00:00:20,880
Now, there are two major terms

11
00:00:20,880 --> 00:00:23,400
associated with continuity of operations planning.

12
00:00:23,400 --> 00:00:25,440
The first one is business continuity planning,

13
00:00:25,440 --> 00:00:28,350
which is often spoken as business continuity plans,

14
00:00:28,350 --> 00:00:32,070
which themself are going to be abbreviated as a BC plan.

15
00:00:32,070 --> 00:00:33,630
Now, this business continuity plan

16
00:00:33,630 --> 00:00:35,700
can refer to the plans or processes

17
00:00:35,700 --> 00:00:38,400
that are used for your response to a disruptive event.

18
00:00:38,400 --> 00:00:39,480
The second kind we have

19
00:00:39,480 --> 00:00:42,840
is known as a disaster recovery plan, or DRP.

20
00:00:42,840 --> 00:00:44,550
Now, these disaster recovery plans

21
00:00:44,550 --> 00:00:47,280
are going to specifically refer to any plans or processes

22
00:00:47,280 --> 00:00:49,410
that are going to be used during a disaster.

23
00:00:49,410 --> 00:00:50,880
Now, a disaster recovery plan

24
00:00:50,880 --> 00:00:52,770
usually is going to be considered a subset

25
00:00:52,770 --> 00:00:55,230
of a more complete business continuity plan as well.

26
00:00:55,230 --> 00:00:57,000
And so, you'll see often that people would just call these

27
00:00:57,000 --> 00:01:02,000
a BC/DR or business continuity disaster recovery plan.

28
00:01:02,040 --> 00:01:04,470
Now, when you think about a business continuity plan,

29
00:01:04,470 --> 00:01:06,930
this plan is going to be used for any disruptive event

30
00:01:06,930 --> 00:01:09,690
or any kind of response to a given threat.

31
00:01:09,690 --> 00:01:10,650
Now, for example,

32
00:01:10,650 --> 00:01:12,390
what would you do if your domain controller

33
00:01:12,390 --> 00:01:14,100
fell victim to a ransomware attack

34
00:01:14,100 --> 00:01:16,920
and all of your users could no longer log into your network?

35
00:01:16,920 --> 00:01:18,780
Well, this would be a disruptive event,

36
00:01:18,780 --> 00:01:21,510
and it might actually activate your incident response plans

37
00:01:21,510 --> 00:01:23,490
and your business continuity plans,

38
00:01:23,490 --> 00:01:25,650
and that's really what we're talking about here.

39
00:01:25,650 --> 00:01:27,390
Now, your business continuity plans

40
00:01:27,390 --> 00:01:29,940
are all about creating a system of preventative actions

41
00:01:29,940 --> 00:01:32,220
and recovery steps in response to threats

42
00:01:32,220 --> 00:01:34,920
that could materialize and then disrupt your business.

43
00:01:34,920 --> 00:01:36,450
Now, your business continuity plan

44
00:01:36,450 --> 00:01:38,790
may also cover your non-technical things too

45
00:01:38,790 --> 00:01:40,500
that would also end up disrupting your business,

46
00:01:40,500 --> 00:01:42,210
so keep that in mind too.

47
00:01:42,210 --> 00:01:43,680
For example, in my business,

48
00:01:43,680 --> 00:01:45,210
we rely heavily on our ability

49
00:01:45,210 --> 00:01:47,820
to take credit card payments online from our students.

50
00:01:47,820 --> 00:01:49,860
So, if a merchant processing account

51
00:01:49,860 --> 00:01:51,720
was going to be canceled for some reason,

52
00:01:51,720 --> 00:01:53,070
this could actually affect our ability

53
00:01:53,070 --> 00:01:54,690
to take payments from our students,

54
00:01:54,690 --> 00:01:57,210
and this would have a major impact on our company.

55
00:01:57,210 --> 00:01:59,610
So, as part of our business continuity planning,

56
00:01:59,610 --> 00:02:01,860
we've discussed how we're going to immediately switch over

57
00:02:01,860 --> 00:02:03,750
to our backup credit card processor

58
00:02:03,750 --> 00:02:05,730
so we can continue our business operations

59
00:02:05,730 --> 00:02:07,350
and simultaneously work

60
00:02:07,350 --> 00:02:09,090
with our primary credit card processor

61
00:02:09,090 --> 00:02:10,500
to get them back online again,

62
00:02:10,500 --> 00:02:11,520
and then get our credit cards

63
00:02:11,520 --> 00:02:13,530
to be able to be processed once more.

64
00:02:13,530 --> 00:02:15,330
Now, if our primary credit card processor

65
00:02:15,330 --> 00:02:18,390
cannot get us back online within X number of days,

66
00:02:18,390 --> 00:02:20,700
then we're going to shift to a tertiary contract

67
00:02:20,700 --> 00:02:21,690
that we have set up,

68
00:02:21,690 --> 00:02:22,523
and that would allow us

69
00:02:22,523 --> 00:02:24,570
to continue our operations indefinitely,

70
00:02:24,570 --> 00:02:27,480
even though that tertiary processor may charge us more

71
00:02:27,480 --> 00:02:29,070
for each processing transaction

72
00:02:29,070 --> 00:02:31,290
than our primary or secondary one does.

73
00:02:31,290 --> 00:02:32,550
But all of this becomes part

74
00:02:32,550 --> 00:02:34,050
of our business continuity plan.

75
00:02:34,050 --> 00:02:36,510
And as we go through, we're going to plan for our primary,

76
00:02:36,510 --> 00:02:38,640
our secondary, and our tertiary actions

77
00:02:38,640 --> 00:02:39,540
that we want to use

78
00:02:39,540 --> 00:02:41,820
to be able to continue our business operations.

79
00:02:41,820 --> 00:02:44,490
Now, another example I saw in a previous organization

80
00:02:44,490 --> 00:02:45,750
that was focused on what they would do

81
00:02:45,750 --> 00:02:47,670
if there was protests in the streets.

82
00:02:47,670 --> 00:02:49,380
Now, this was an IT organization,

83
00:02:49,380 --> 00:02:50,850
and it may seem kind of weird to you

84
00:02:50,850 --> 00:02:52,980
that they're thinking about protests in the streets,

85
00:02:52,980 --> 00:02:54,000
but because their headquarters

86
00:02:54,000 --> 00:02:56,250
was actually located near a major American city,

87
00:02:56,250 --> 00:02:57,930
they had this as a concern.

88
00:02:57,930 --> 00:02:59,010
Now, when there was protests

89
00:02:59,010 --> 00:03:01,140
and riots in the city back in 2020,

90
00:03:01,140 --> 00:03:02,850
they actually found that it disrupted their business

91
00:03:02,850 --> 00:03:03,683
because their employees

92
00:03:03,683 --> 00:03:05,910
couldn't get to the headquarters to do their job.

93
00:03:05,910 --> 00:03:07,350
So, now they decide,

94
00:03:07,350 --> 00:03:10,110
what are we going to do in case the streets get barricaded?

95
00:03:10,110 --> 00:03:12,240
Whether that's from protesters trying to make a point

96
00:03:12,240 --> 00:03:14,310
or police try to hold back those rioters,

97
00:03:14,310 --> 00:03:16,800
how are we going to get our employees to do their job?

98
00:03:16,800 --> 00:03:18,360
Well, after that initial incident,

99
00:03:18,360 --> 00:03:20,700
the company learned they need to have a backup plan

100
00:03:20,700 --> 00:03:21,540
for how they're going to keep

101
00:03:21,540 --> 00:03:23,430
their operations running all the time,

102
00:03:23,430 --> 00:03:24,263
even if their people

103
00:03:24,263 --> 00:03:26,520
can't physically get to the office building.

104
00:03:26,520 --> 00:03:28,470
And so, that became one of the big considerations

105
00:03:28,470 --> 00:03:30,150
in their business continuity plan,

106
00:03:30,150 --> 00:03:33,150
and they actually have a section titled Riots and Protests

107
00:03:33,150 --> 00:03:35,850
and What Their Employees Should Do If That Happens.

108
00:03:35,850 --> 00:03:37,620
Now, we just spent a little bit of time here

109
00:03:37,620 --> 00:03:40,440
talking about the basic idea of a business continuity plan,

110
00:03:40,440 --> 00:03:41,610
but let's touch on the concept

111
00:03:41,610 --> 00:03:43,680
of a disaster recovery plan too.

112
00:03:43,680 --> 00:03:46,230
Now, a disaster recovery plan, or DR plan,

113
00:03:46,230 --> 00:03:47,580
is usually going to be a subset

114
00:03:47,580 --> 00:03:49,410
of your business continuity plan.

115
00:03:49,410 --> 00:03:50,580
The disaster recovery plan

116
00:03:50,580 --> 00:03:52,290
is going to focus on disruptive events,

117
00:03:52,290 --> 00:03:54,300
just like a business continuity plan would,

118
00:03:54,300 --> 00:03:56,100
but it's going to specifically focus

119
00:03:56,100 --> 00:03:58,350
on how to resume your operations more quickly

120
00:03:58,350 --> 00:04:00,240
after you have a disaster.

121
00:04:00,240 --> 00:04:02,430
For example, our Dion training offices

122
00:04:02,430 --> 00:04:04,410
are located down in Orlando, Florida,

123
00:04:04,410 --> 00:04:06,360
which is very likely to suffer from hurricanes

124
00:04:06,360 --> 00:04:07,920
because of its location.

125
00:04:07,920 --> 00:04:09,240
Now, our business continuity plan

126
00:04:09,240 --> 00:04:11,310
contains a disaster recovery plan portion

127
00:04:11,310 --> 00:04:13,020
that's focused on our response actions

128
00:04:13,020 --> 00:04:15,420
for things like hurricanes, fires, floods,

129
00:04:15,420 --> 00:04:16,980
and other things like that.

130
00:04:16,980 --> 00:04:19,470
So, if we have a hurricane down here in Florida,

131
00:04:19,470 --> 00:04:21,360
how are we going to be able to keep our offices open

132
00:04:21,360 --> 00:04:24,600
and our servers online 24 hours a day, 7 days a week?

133
00:04:24,600 --> 00:04:27,720
And if we can't, what are we going to do in response to that?

134
00:04:27,720 --> 00:04:29,100
What are we going to do if there's an earthquake,

135
00:04:29,100 --> 00:04:31,710
a fire, a flood, or some other kind of disaster?

136
00:04:31,710 --> 00:04:33,390
Now, all of these are things that we had to think about

137
00:04:33,390 --> 00:04:35,910
when we were creating our disaster recovery plan.

138
00:04:35,910 --> 00:04:39,000
So, for example, when we did our risk management analysis,

139
00:04:39,000 --> 00:04:40,800
we determined it was just too risky for us

140
00:04:40,800 --> 00:04:43,380
to host our servers in our on-premise environment

141
00:04:43,380 --> 00:04:45,930
because of our location is so hurricane prone,

142
00:04:45,930 --> 00:04:47,910
and we were worried about the threat of a power loss

143
00:04:47,910 --> 00:04:49,290
or network connectivity loss

144
00:04:49,290 --> 00:04:51,420
because a hurricane ravages the area.

145
00:04:51,420 --> 00:04:53,220
So, instead, we ended up building out

146
00:04:53,220 --> 00:04:55,320
our entire infrastructure in the cloud,

147
00:04:55,320 --> 00:04:57,720
and we actually use Amazon Web Services to do this,

148
00:04:57,720 --> 00:04:59,700
and they provide us with continuity of operations

149
00:04:59,700 --> 00:05:01,020
by spreading all of our services

150
00:05:01,020 --> 00:05:04,320
across multiple AWS regions and availability zones.

151
00:05:04,320 --> 00:05:06,480
This way, even if there was a severe disaster

152
00:05:06,480 --> 00:05:07,620
in Orlando, Florida,

153
00:05:07,620 --> 00:05:10,950
our business operations can continue on unimpeded.

154
00:05:10,950 --> 00:05:11,970
Now, another thing we did

155
00:05:11,970 --> 00:05:14,610
is we actually split our staff across multiple locations,

156
00:05:14,610 --> 00:05:16,710
both within Florida, the rest of the United States,

157
00:05:16,710 --> 00:05:19,200
and a few other locations around the world.

158
00:05:19,200 --> 00:05:21,870
For example, if you email us and ask a question,

159
00:05:21,870 --> 00:05:24,300
that's actually handled by our student success team.

160
00:05:24,300 --> 00:05:25,350
Now, our student success team

161
00:05:25,350 --> 00:05:27,570
is actually split evenly between the United States

162
00:05:27,570 --> 00:05:29,370
and the country of the Philippines.

163
00:05:29,370 --> 00:05:32,010
Now, if there's a power outage in our offices in Florida,

164
00:05:32,010 --> 00:05:34,320
our Philippines team can actually take over operations

165
00:05:34,320 --> 00:05:36,570
and continue to work to make sure that you, our students,

166
00:05:36,570 --> 00:05:38,190
are being taken care of.

167
00:05:38,190 --> 00:05:39,750
Similarly, over the last few years,

168
00:05:39,750 --> 00:05:41,040
we've seen that floods have happened

169
00:05:41,040 --> 00:05:42,570
in the country of the Philippines.

170
00:05:42,570 --> 00:05:44,850
And when that happened, our US-based team

171
00:05:44,850 --> 00:05:47,370
was able to step up and cover for the Philippines team

172
00:05:47,370 --> 00:05:49,050
while they took a couple of days off of work

173
00:05:49,050 --> 00:05:51,030
to make sure they were safe, their family was safe,

174
00:05:51,030 --> 00:05:52,560
and their homes were taken care of

175
00:05:52,560 --> 00:05:53,700
because our Philippines team

176
00:05:53,700 --> 00:05:55,170
had other more important things to do,

177
00:05:55,170 --> 00:05:56,280
and they couldn't get to work

178
00:05:56,280 --> 00:05:57,660
because maybe their power was down,

179
00:05:57,660 --> 00:05:58,800
or their internet was offline,

180
00:05:58,800 --> 00:06:00,570
or their house was being flooded.

181
00:06:00,570 --> 00:06:01,770
And in any of these cases,

182
00:06:01,770 --> 00:06:03,360
they need time to take care of that,

183
00:06:03,360 --> 00:06:05,220
and we can do that by shifting the operations

184
00:06:05,220 --> 00:06:06,900
back to our Florida Center.

185
00:06:06,900 --> 00:06:08,040
By dispersing our operations

186
00:06:08,040 --> 00:06:09,870
across multiple geographic regions,

187
00:06:09,870 --> 00:06:11,430
we're able to continue our operations

188
00:06:11,430 --> 00:06:14,160
even in the face of these kinds of disasters.

189
00:06:14,160 --> 00:06:15,720
So, now that we've covered the differences

190
00:06:15,720 --> 00:06:17,340
between a business continuity plan

191
00:06:17,340 --> 00:06:19,410
and the disaster recovery plan it contains,

192
00:06:19,410 --> 00:06:20,640
for the rest of this lesson,

193
00:06:20,640 --> 00:06:23,280
I'm only going to refer to the business continuity plan.

194
00:06:23,280 --> 00:06:26,070
But when I do, remember I'm really equally referring

195
00:06:26,070 --> 00:06:27,480
to both the business continuity

196
00:06:27,480 --> 00:06:29,460
and the disaster recovery plan it contains

197
00:06:29,460 --> 00:06:31,080
because the only real difference here

198
00:06:31,080 --> 00:06:33,630
is the type of event that you are going to be responding to.

199
00:06:33,630 --> 00:06:34,710
If it's an incident,

200
00:06:34,710 --> 00:06:36,930
then it's going to be a business continuity issue.

201
00:06:36,930 --> 00:06:40,290
If it's a disaster, it's going to be a disaster recovery issue.

202
00:06:40,290 --> 00:06:42,450
That's really going to determine which plan you're going to follow

203
00:06:42,450 --> 00:06:44,400
during your response actions based on the event

204
00:06:44,400 --> 00:06:46,470
that you're actually taking actions against.

205
00:06:46,470 --> 00:06:48,600
Now, the development of your business continuity plan

206
00:06:48,600 --> 00:06:50,010
is really going to be the responsibility

207
00:06:50,010 --> 00:06:52,560
of your senior managers within your organization.

208
00:06:52,560 --> 00:06:54,180
It's up to them to drive this effort

209
00:06:54,180 --> 00:06:56,010
and ensure that it's being done properly.

210
00:06:56,010 --> 00:06:57,180
Now, without their support,

211
00:06:57,180 --> 00:06:58,770
the business continuity plan development

212
00:06:58,770 --> 00:07:00,780
is actually going to stall out and fail.

213
00:07:00,780 --> 00:07:02,880
For this reason, it really is the responsibility

214
00:07:02,880 --> 00:07:04,830
of your senior management to help set goals

215
00:07:04,830 --> 00:07:05,790
for the business continuity

216
00:07:05,790 --> 00:07:07,170
and disaster recovery efforts

217
00:07:07,170 --> 00:07:09,630
that are being put under this senior management control.

218
00:07:09,630 --> 00:07:10,590
They're also going to make sure

219
00:07:10,590 --> 00:07:12,840
that a business continuity coordinator is being appointed,

220
00:07:12,840 --> 00:07:15,240
and they're going to lead the business continuity committee

221
00:07:15,240 --> 00:07:17,040
that develops these plans.

222
00:07:17,040 --> 00:07:18,660
Now, this business continuity committee

223
00:07:18,660 --> 00:07:19,620
should have representatives

224
00:07:19,620 --> 00:07:21,870
from different departments across your organization,

225
00:07:21,870 --> 00:07:23,490
including your technology department,

226
00:07:23,490 --> 00:07:25,470
your legal department, your security department,

227
00:07:25,470 --> 00:07:26,760
your communications department,

228
00:07:26,760 --> 00:07:28,830
and others, just to name a few.

229
00:07:28,830 --> 00:07:31,770
Now, this should not be just the IT people doing this thing

230
00:07:31,770 --> 00:07:34,650
because we all need to work together across the organization

231
00:07:34,650 --> 00:07:36,210
to ensure we know how we're going to continue

232
00:07:36,210 --> 00:07:37,500
to operate our business.

233
00:07:37,500 --> 00:07:39,090
Remember, we're not just covering

234
00:07:39,090 --> 00:07:40,560
the technology or the networks,

235
00:07:40,560 --> 00:07:42,900
we are covering everything inside of the business.

236
00:07:42,900 --> 00:07:44,100
And this is the reason we need people

237
00:07:44,100 --> 00:07:46,320
from across the organization helping us.

238
00:07:46,320 --> 00:07:47,940
This committee is going to be working

239
00:07:47,940 --> 00:07:49,320
to determine the recovery priorities

240
00:07:49,320 --> 00:07:51,270
for the different types of events that could occur,

241
00:07:51,270 --> 00:07:52,620
whether they're going to be disruptive,

242
00:07:52,620 --> 00:07:53,610
and whether they're going to be covered

243
00:07:53,610 --> 00:07:54,900
by the business continuity plan

244
00:07:54,900 --> 00:07:58,080
or your disaster recovery plan if it's a disaster.

245
00:07:58,080 --> 00:08:00,390
This committee is also going to seek out to identify

246
00:08:00,390 --> 00:08:02,040
and prioritize all of our systems

247
00:08:02,040 --> 00:08:03,090
that we're going to need to support

248
00:08:03,090 --> 00:08:04,650
the continuity of our business,

249
00:08:04,650 --> 00:08:07,470
and then they'll report back to senior management.

250
00:08:07,470 --> 00:08:10,140
Now, another key part of a good business continuity plan

251
00:08:10,140 --> 00:08:12,390
is defining the scope of the plan itself.

252
00:08:12,390 --> 00:08:14,490
Otherwise, you could face scope creep.

253
00:08:14,490 --> 00:08:17,250
Again, this is another great job for senior management

254
00:08:17,250 --> 00:08:19,080
because they need to determine the level of risk

255
00:08:19,080 --> 00:08:20,400
that they're willing to accept

256
00:08:20,400 --> 00:08:22,260
based on the organization's risk appetite

257
00:08:22,260 --> 00:08:24,180
and risk tolerance thresholds.

258
00:08:24,180 --> 00:08:25,440
Now, the business continuity plan

259
00:08:25,440 --> 00:08:27,120
will be broken down by business function

260
00:08:27,120 --> 00:08:28,500
or geographical area

261
00:08:28,500 --> 00:08:30,720
if you're working in a very large organization.

262
00:08:30,720 --> 00:08:33,150
But again, all these pieces have to be coherent

263
00:08:33,150 --> 00:08:34,500
and they must be able to operate together,

264
00:08:34,500 --> 00:08:36,450
especially during times of crisis.

265
00:08:36,450 --> 00:08:37,799
So, remember, when it comes

266
00:08:37,799 --> 00:08:39,780
to the continuity of operations plan,

267
00:08:39,780 --> 00:08:42,000
you're going to have two main parts of that.

268
00:08:42,000 --> 00:08:44,220
One is going to be your business continuity plan,

269
00:08:44,220 --> 00:08:45,690
or your BC plan,

270
00:08:45,690 --> 00:08:46,523
and the second

271
00:08:46,523 --> 00:08:49,590
is going to be your disaster recovery plan, or DRP.

272
00:08:49,590 --> 00:08:51,540
When it comes to your business continuity plan,

273
00:08:51,540 --> 00:08:53,880
remember that this refers to the plans and processes

274
00:08:53,880 --> 00:08:56,580
that are used for your response to a disruptive event.

275
00:08:56,580 --> 00:08:58,530
But when you're dealing with a disaster recovery plan,

276
00:08:58,530 --> 00:08:59,580
you're specifically talking about

277
00:08:59,580 --> 00:09:00,840
the plans and processes

278
00:09:00,840 --> 00:09:03,750
that are going to be used to respond to a given disaster.

279
00:09:03,750 --> 00:09:04,800
That's really the biggest difference

280
00:09:04,800 --> 00:09:06,510
between a business continuity plan

281
00:09:06,510 --> 00:09:08,010
and a disaster recovery plan

282
00:09:08,010 --> 00:09:10,680
because one, we're dealing with incidents and issues,

283
00:09:10,680 --> 00:09:12,880
and the other, we're dealing with disasters.
